banner

Steatite Connectors

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2020-01-17 12:06

  • Browse the number:

    63

Send an inquiries
Company Profile
CeaGoo Co., Limited
By certification [File Integrity]
Contact:

senguo(Mr.)  

Email:

Telephone:

Phone:

Area:

Beijing

Address:

Room 4002, 4rd Floor, No. 4 Shanxian Road, Hangzhou, China

Website: http://www.ceagooceramic.com/ http://senguo.treasurehunthealth.com/
Product details

Production Description

CeaGoo’s steatite connectors are made in high purity steatite which are used to support heating and electric elements. Steatite connectors are good high voltage insulator, they can withstand thousands of volts without breaking down, so they have widely applications in many industries, such as sockets and lignthings.


Material Properties

Properties

Units

Steatite

Physical

Density, r

g/cm3

2.71

Crystal Structure


hexagonal

Water Absorption

% @R.T.

0.0 - 0.02

Hardness

knoop (kg/mm2)

-

Hardness

R45N

57

Mechanical

Compressive Strength

MPa @ R.T.

621

Tensile Strength

MPa @ R.T.

62

Modulus of Elasticity

Gpa

138

Flexural Strength (MOR)

MPa @ R.T.

140

Poisson's Ratio, u


-

Fracture Toughness, KIc

MPa x m1/2

-

Thermal

Max. Use Temperature

oC

1425

Thermal Shock Resistance

DT (oC)

100

Thermal Conductivity

W/m-K @ R.T.

2.9

Thermal Expansion Coefficient

mm/m-ºC

7

Specific Heat

cal/g-oC @ R.T.

0.22

Electrical

Dielectric Constant

1MHz @ R.T.

6.3

Dielectric Strength

kV/mm

9.3

Electrical Resistivity

Wcm @ R.T.

>1014


Optimize the layout of alumina industry

The competent department of mineral resources shall carry out a comprehensive verification of the existing resources of bauxite and promote the exploration of bauxite resources. In case of a substantial increase in the reserves of resources, the development planning department shall increase the distribution or agree to expand the production capacity of the enterprises within the distribution according to the actual situation. The provincial environmental protection department shall not arrange environmental protection evaluation for the alumina project to be built outside the planned distribution point without permission, and the construction without permission must be stopped. For alumina projects and self provided power plants that are not built in the planned layout without consent, punitive electricity price will be applied.


http://www.ceagooceramic.com/